Scheduled Maintenance
UTOPIA Maintenance in Orem 5.10.24

DESCRIPTION: UTOPIA maintenance OR003 power upgrade/testing

MAINTENANCE START TIME: 5/10/2024 12:01 AM MST MAINTENANCE STOP TIME: 5/10/2024 6:00 AM MST

SCOPE OF IMPACT: All affected customers will experience a brief outage while maintenance is being performed.

UTOPIA Maintenance in Centerville 5/10/24

DESCRIPTION: UTOPIA maintenance CV001 power upgrade/testing.

MAINTENANCE START TIME: 5/10/2024 12:01 AM MST MAINTENANCE STOP TIME: 5/10/2024 6:00 AM MST

SCOPE OF IMPACT: All affected customers will experience a brief outage while maintenance is being performed.

UTOPIA Maintenance in Layton 5/17/24

DESCRIPTION: UTOPIA maintenance LA002 power testing/upgrade.

MAINTENANCE START TIME: 5/17/2024 12:01 AM MST MAINTENANCE STOP TIME: 5/17/2024 6:00 AM MST

SCOPE OF IMPACT: All affected customers will experience a brief outage while maintenance is being performed.

Incidents

25th March 2021

No incidents reported

24th March 2021

No incidents reported

23rd March 2021

No incidents reported

22nd March 2021

No incidents reported

21st March 2021

No incidents reported

20th March 2021

UTOPIA Emergency Maintenance Notification in Orem, scheduled 3 years ago

DESCRIPTION:

UTOPIA will be performing an emergency reboot on our switch stack in the OR013 footprint.

SCOPE OF IMPACT:

All customers connected to the switch will experience an outage lasting several minutes while the switch stack reboots.

MAINTENANCE START TIME:

03/20/2021 12:01 a.m.

MAINTENANCE END TIME:

03/20/2021 5:00 a.m.

19th March 2021

UTOPIA Maintenance in Orem, scheduled 3 years ago

UTOPIA will be making a change to the configuration on switch OR014-ADS-7004 in the OR014 footprint located in Orem Utah.

MAINTENANCE START TIME: 03/19/2021 12:00 a.m. MST

MAINTENANCE STOP TIME: 03/19/2021 05:00 a.m. MST

SCOPE OF IMPACT:

          This is expected to be non-customer affecting
Mail Systems Outage

We are aware of issues affecting all email customers. Admins are currently working to bring services back to 100%

18th March 2021

Transport outage to SIX

Starting at 14:33, we lost our connection to the Seattle Interent eXchange. We are currently investigating the cause, and in the meantime are routing traffic through our other upstream transport connections to minimize impact to customers. ETA still being determined

17th March 2021

No incidents reported

16th March 2021

No incidents reported

15th March 2021

No incidents reported

14th March 2021

No incidents reported

13th March 2021

No incidents reported

12th March 2021

Scheduled Power Infrastructure Maintenance, scheduled 3 years ago

XMission is scheduling maintenance work for Friday, March 12th starting at 8 p.m. MST to troubleshoot and repair the ATS (Automatic Transfer Switch) which briefly malfunctioned and caused a short, partial outage in our data center the night of January 22nd.

Although we immediately contacted our vendor after the outage, we needed to wait for the repair parts to arrive. On Friday night our electricians will consolidate all power over to our redundant bus to completely de-energize the ATS so the generator specialists can safely and thoroughly test all key components then replace or repair whatever they find amiss. To clarify, we will temporarily move all power to a single source, secured through our operational ATS and UPS system. Once the ATS in question has been repaired the vendor will test it to confirm everything is working properly before we move load back to the power bus and wrap up maintenance. XMission will have the appropriate staff standing by in the event of power-loss, however no downtime is expected.

Anyone interested in learning more about our redundant data center infrastructure can refer to our data sheet online at: https://asset.xmission.com/xmweb2/pdf/Server-Colo-Datasheet.pdf

11th March 2021

No incidents reported

10th March 2021

UTOPIA Maintenance in Tremonton, scheduled 3 years ago

UTOPIA will be replacing a router to allow for an increase bandwidth. Affected customers can expect to be down for 30 minutes.

MAINTENANCE START TIME: 3/10/2021 12:00 a.m. MST

MAINTENANCE STOP TIME: 3/10/2021 01:00 a.m. MST

9th March 2021

Zimbra Hosted Email minor system updates, scheduled 3 years ago

We will be installing some minor updates on our Zimbra infrastructure tonight (03/09/2021) starting at 10PM MST. Less than 30 minutes of service interruptions expected as we restart backend services. No email will be lost.

8th March 2021

No incidents reported

7th March 2021

No incidents reported

6th March 2021

No incidents reported

5th March 2021

No incidents reported

4th March 2021

No incidents reported

3rd March 2021

No incidents reported

2nd March 2021

No incidents reported

1st March 2021

No incidents reported

28th February 2021

No incidents reported

27th February 2021

No incidents reported

26th February 2021

No incidents reported

25th February 2021

No incidents reported

24th February 2021

XMission Office phone system upgrades, scheduled 3 years ago

XMission is upgrading our office phone system to improve our customer interaction when calling into the offices. During the upgrades our office phones may be unavailable and we ask if customers need assistance during this maintenance to contact us via Live Chat or E-Mail.